Side friction is developed when a shaft is provided to resist Vertical loads. The side friction between soil and shaft results relative movements between them. The maximum side friction is often developed after relative small displacements less than 0.5 inches. Side friction is limited by the adhesion between the shaft and the soil or else the shear strength of the adjacent soil, whichever is smaller. 

Side friction often contributes the most bearing capacity in practical situations unless the base is bearing on stiff shale or rock that is much stiffer and stronger than the overlying soil.

Side friction for pile shaft foundation
Side friction is hard to accurately estimate, especially for foundations constructed in augered or partially jetted holes or foundations in stiff, fissured clays.

1 comment:

  1. This post is very useful for us. Because we have a lot of tips and tricks from this post. Thank you for this amazing post share.
    whilst pleasant the amazing screw will do. when and where to store on piling expenses with screw piles.
    We provide services of Besment waterproofing, concrete repair, footings, subsidence, basement underpin articles, basement walls, retaining walls, shoring, spray concrete, underpinning, grout injection, house underpinning(sydney), underpinning services, foundation repairs, basement garages, house restumping and ventilation sub-floor.blade pile