foundation system of burj al arab

Requirements for Wash Water for Using in Ready-Mixed Concrete (Part-2)

This is a continuation for requirements for wash water for using in ready-mixed concrete(P-1). For better understanding reader are required to read previous post. Now we will go to the point.


Regarding testing frequency ASTM specifies that throughout the first 4 weeks the test should be conducted in a interval of a week. After that a monthly interval of testing can be accepted frequency. In each test the results must not exceed the limit stated in table-1(See last post).


The purchaser can specify the testing frequencies for chemical limits or the frequencies specified before can be used for these tests.

The chemical limit test is specified as option in this standard. But purchaser can specify to test for these limits. 

READ ALL PARTS

Table-2: optional limits for chemical content in wash water
 

Optional limits for chemical content in wash water in ready mixed concrete

No comments:

Post a Comment

Followers