OFFSETS AND OFFCENTERING LIMITS OF BORED PILE

Bored piles are cast on the construction site which is normally of the order of 50 meters depth of drilling. The drilling depth and method is depending on the soil condition which is determined from soil investigation and decide suitable drilling technology. During boring there may have mis-alinement from the designed pile center.  

Off centering of bored piles in the vertical direction shall not be more than 1 in 200 of the bored pile length.


Offset from center in the horizontal direction shall not be more than 10 cm in any direction.
Pile driving

If any completed bored pile exhibit larger offsets than the above values, the Contractor must carry out corrective measure or construct a new bored pile as dictated by the Engineer all under the Contractor's own expense.