foundation system of burj al arab

COMPARISON BETWEEN FEASIBIITY OF HIGH SPEED RAIL & ELECTROMAGNETIC RAIL IN BANGLADESH(PART-10)

COST COMPARISON BETWEEN ELECTROMAGNETIC & HIGH SPEED RAIL:


PRELIMINARY DECISION

From the table highlighted above, the cost of Electromagnetic rail is so high in both cases that it is not suitable for Bangladesh compared with High speed rail.
In terms of cost Electromagnetic rail may be comparable with Air transportation system, which is not included in our project.
Now we try to check the feasibility of High speed rail compared with Conventional rail (with respect to cost).
TABLE-06

MAIN COSTELECTROMAGNETIC RAILHIGH SPEED RAIL
Investment cost
Tk. 80 billion/kmTk.3 billion/km
Other major costs (maintenance cost, operating cost, fixed & variable cost)
Tk. 1,52,170/kmTk.78,768/km

INTERMODAL COMPARISON OF LONG RUN AVERAGE COST (PER PASSENGR-KILOMETER):

TABLE-07

Cost CategoryAir SystemHigh Speed RailHighwaysConventional Rail
Infrastructure: Construction and

Maintenance
Tk. 1.24 Tk. 8.8 Tk. 0.82 Tk. 1.0
Carrier: Capital Cost Tk. 4.1 Tk. 0.68 Tk. 0.0 Tk. 0.30
Carrier: Operating Cost Tk. 2.31 Tk. 3.4 Tk. 0.0 Tk. 0.8
External: Accidents Tk. 0.27 Tk. 0.0 Tk. 1.36 Tk. 0.15
External: Congestion Tk. 0.12 Tk. 0.0 Tk. 0.313 Tk. 0.30
External: Noise Tk. 0.292 Tk. 0.14 Tk. 0.31 Tk. 0.35
External: Pollution Tk. 0.06 Tk. 0.0 Tk. 0.21 Tk. 0.11
User: Fixed + Variable Tk. 0.0 Tk. 0.0 Tk. 5.85 Tk. 4.12
User: TimeTk. 0.78Tk. 3.0 Tk. 6.8 Tk. 6.67
TOTAL Tk. 9.17 Tk. 16.02 Tk. 15.67 Tk. 13.80
   
COMPARISON OF THE FULL COST OF A TRIP (PER PASSENGER-KILOMETER):

TABLE-08

     Internal External Total
Highway Tk. 13.47Tk. 2.193 Tk. 15.67
Air
Tk. 8.43Tk. 0.742 Tk. 9.172
H.S. Rail Tk. 15.88 Tk. 0.14 Tk. 16.02
Conventional Rail Tk. 12.89 Tk. 0.91 Tk. 13.80
 COST COMPARISON BETWEEN HIGH SPEED RAIL & CONVENTIONAL RAIL:

TABLE- 09

MAIN COSTHIGH SPEED RAILCONVENTIONAL RAIL (STEEL SLEEPER)
Investment cost
Tk. 3 billion/kmTk. (1.5-2) billion/km
Track cost
Tk. 12.5 million/kmTk. 89,82,355.00/km

(for steel sleeper)
Other major costs (maintenance cost, operating cost, fixed &variable cost) Tk. 78,768/kmTk. 48,975/km


  TIME Vs DISTANCE GRAPH



 Figure-17
TIME ESTIMATION FOR 480 KM:

TABLE-10

TYPE OF TRANSPORTSPEED (km/h)TIME (hour)COST PER PASSEN.-HOUR (Tk.)TOTAL COST PER PASSENGER
High speed rail
180
2.67
2800
7476
Conventional rail
80
6
1100
6600
Highway transport (Bus)
80-90
5.5-6
1340
7705
   
Based on the above datas cost of high speed rail is higher than conventional rail but with respect to time it is preferable for passengers than other transports.